
NUMBER: 380
SUBJECT: WORK ORDERS
AUTHORIZING BODY: VICE PRESIDENT FOR FINANCE & ADMINISTRATION
RESPONSIBLE OFFICE: FACILITIES MANAGEMENT
DATE ISSUED: APRIL 1970
LAST UPDATE: FEBRUARY 2006
RATIONALE: To provide information regarding the submission and processing of work orders. To ensure that alterations and improvements of physical structures are in conformity with Oakland University policy.
POLICY: The Facilities Management Department is responsible for repairs, renovations, alterations, improvements, elimination of safety hazards to campus buildings and grounds, and moving/setup operations. Alterations or modifications to the physical features of University facilities require the approval of Facilities Management (see Policy # 310).
All service calls generated by work order requests are dispatched by the Work Control Center. Service calls considered emergencies and/or “quick calls” are handled immediately by a radio call to the “building specialist”. All other calls are considered “routine” and are forwarded to the supervisor of the applicable trade necessary to correct the problem. These calls are scheduled on a first-in, first-out (FIFO) basis, unless higher authority establishes a priority. HVAC trades-personnel are referred to as the “building _specialists” and are assigned specific buildings to cover calls considered emergencies and/or “quick calls”.
When remodeling or alterations to University facilities are requested, approval is required from Facilities Management for review. Service calls are handled by the corresponding area:
Heating, Ventilation, and Air Conditioning (HVAC)
Electricians
Plumbers
Carpenters
Locksmiths
Painters
Custodians
Groundskeepers
Moving & setup personnel
The Work Request form (Appendix A) should be completed whenever remodeling, altering or requesting service. The form must list all required information and include the Department Head’s signature or authorized representative. The goldenrod copy of the Work Request form should be retained by the requesting department with the remainder forwarded to the Work Control Center.
The billing of chargeable work orders is comprised of the costs of actual labor and materials plus a 10% Indirect Recovery Charge. The software program named Computerized Management Maintenance System collects charges monthly and forwards these charges to the Accounting Department for posting to the fund of the applicable department.
APPENDIX A
